PaintOttawa knowledge
Twenty-five decisions behind a lasting paint job
Search by the problem you are trying to solve. Safety-sensitive conditions are held for professional review.
The 25 topics on this page
Each one is a decision a homeowner makes before or during a paint job, written from our own work in Ottawa homes. The search box above filters them; this list is the same content in full.
- Project readiness (planning): Confirm repairs, moisture sources, access, furniture movement and cure time before scheduling coating work.
- Surface cleaning (preparation): Paint performs best on clean, dry, sound surfaces. Kitchens, bathrooms and high-touch areas may need targeted degreasing.
- Filling holes and dents (preparation): Repair method depends on size, substrate and movement. A cosmetic fill cannot correct an active structural or moisture problem.
- Sanding and dust control (preparation): Sanding levels repairs and creates adhesion, while containment and extraction protect occupied spaces.
- When primer is needed (products): Primer may be needed for bare repairs, porous surfaces, stains, adhesion changes and major colour transitions.
- Choosing wall sheen (products): Lower sheen hides more surface variation; higher sheen generally cleans more easily but can reveal defects.
- Ceiling coatings (ceilings): Ceilings need careful light inspection, compatible repair materials and products suited to the required finish.
- Trim and doors (trim): Hard-wearing trim systems depend on cleaning, sanding, adhesion and cureānot colour alone.
- Bathrooms and humidity (moisture): Resolve active moisture and ventilation problems before coating. Paint does not repair a leak or diagnose mould.
- Basement painting (moisture): Below-grade staining, efflorescence or peeling can indicate moisture movement requiring review before repainting.
- Kitchen preparation (preparation): Grease, silicone and cleaning residues can interfere with adhesion and must be addressed before coating.
- Cabinet refinishing (specialty): Cabinet coating is a specialty workflow involving substrate identification, degreasing, profile preparation and controlled application.
- Colour changes (colour): Large light-to-dark or dark-to-light changes may alter primer choice and required coat count.
- Testing colour in the room (colour): Review samples under daylight and evening lighting beside fixed flooring, counters, trim and furnishings.
- Matching an existing colour (colour): Save brand, product line, colour code, sheen and tint label. Age and exposure can make a perfect touch-up impossible.
- Painting new drywall (drywall): New compound and board must be dry, dust-controlled and properly primed before finish coats.
- Painting repaired drywall (drywall): Repairs may flash through paint unless porosity, sanding profile and primer are handled consistently.
- Peeling and adhesion failure (failure): Peeling can involve moisture, contamination, incompatible coatings or weak underlying layers. Determine the cause before recoating.
- Stains and water marks (failure): Confirm the source is resolved and the surface is dry before stain blocking or repainting.
- Older coatings and unknown materials (safety): Do not sand or disturb an unknown older coating until appropriate hazard assessment determines a safe method.
- Occupied-home protection (planning): Document protection, access, dust control, daily cleanup, ventilation and room availability in the scope.
- Drying versus curing (products): Dry-to-touch does not mean fully cured. Recoat, washing and heavy-use timing depend on product instructions and conditions.
- Exterior painting season (exterior): Temperature, surface moisture, direct sun, wind and forecast conditions control whether exterior coating can proceed.
- Maintenance and touch-ups (maintenance): Keep a small labelled quantity when appropriate and record where it is stored, when it was opened and what surface it belongs to.
- Your paint ownership record (maintenance): Photograph the can label and save the room, surface, brand, product, colour code, sheen, primer and application date in the Home Ownership Manual.